Xiamen A Packing Factory invested 1.5 million annual production of 12 tons of color box project through the EIA

Xiamen Jimei Environmental Protection Bureau

The Jimei Environmental Protection Bureau of Xiamen City, Fujian Province issued an EIA announcement on a series of projects on February 21. Among them, Xiamen Pingsheng Industry and Trade Co., Ltd. passed the EIA project with an annual output of 12 tons of color box expansion project. The total investment of the project is 1.5 million yuan. Among them, environmental protection investment is 500,000 yuan.

Construction project overview

The project is located on the north side of the 1-3rd floor of No. 158 Tianfeng Road, Jimei District, Xiamen City. The construction content of the project is as follows: the scale of the expansion project is 12 tons of color boxes and 15 tons of specifications. The total investment of the project is 1.5 million yuan, including environmental protection investment of 500,000 yuan.

The project must implement the following ecological protection and pollution prevention measures:

(1) The sewage discharge port connecting the project with the municipal sewage pipe shall be constructed according to the standardization requirements of the sewage discharge port, and shall have sampling and monitoring conditions. The industrial wastewater generated by the project is disposed of as a hazardous waste commissioned qualified unit.

(2) Implementing measures for prevention and control of exhaust gas pollution. Combined with the layout of the production line, the organic waste gas collection and treatment will be strengthened to ensure compliance with standards. The construction unit shall strengthen the design, operation management and maintenance of various exhaust gas collection systems and treatment facilities such as printing processes, increase the collection rate of exhaust gas, and reduce the impact of accidental emissions and unorganized emissions on the surrounding environment. All kinds of exhaust gas exhaust cylinders meet the corresponding emission rate requirements and monitoring sampling conditions. The height of the exhaust pipe must comply with relevant national regulations. The exhaust port should be set to avoid environmental sensitive points in the surrounding residential area and set a certain width of sanitary protection distance.

(3) Equipment selection should give priority to high-performance, low-noise equipment or machinery, reduce the sound source intensity from the source; reasonably arrange the noise source, place the high-noise equipment indoors as much as possible; high-noise equipment should take vibration and isolation Sound and noise reduction measures. Maintenance and maintenance of equipment should be carried out during operation to ensure the normal operation of high-noise equipment.

(4) Standardize the temporary storage facilities and sites for solid waste classification, implement anti-seepage and anti-leaching measures, and set labels and explanatory signs as required. General industrial solid waste should be collected and disposed of properly. Hazardous waste generated during the operation period of the project shall be collected and stored in a standardized manner and entrusted to qualified units to implement harmless disposal. The annual solid waste management plan shall be formulated to implement the annual solid waste declaration and registration system and report to the environmental protection authorities in a timely manner.

(5) Establishing a company's environmental protection management organization, equipped with full-time personnel and facilities, formulating an environmental management system, establishing an environmental responsibility system, strengthening job training, and strictly implementing the operational procedures and operation and maintenance management systems of various environmental protection facilities to ensure normal environmental protection facilities. run. Strictly implement the environmental monitoring and monitoring plan during the operation period to ensure that all pollutants are discharged to meet the standards and meet the requirements of total control.

This article is posted on this website for the purpose of transmitting more information and does not imply endorsement of its views or confirmation of its description.

Article source address: http://

Handmade Straw Bags

Hand-Woven Bag,Hand Woven Bags,Handmade Straw Bags,Straw Handmade Bag

Shandong Guyi Crafts Co.,Ltd , https://www.guyicraftscn.com

Posted on